大藤峡水利枢纽工程二期围堰防渗墙工期及施工方案设计 被引量:1

Construction period and scheme design of cutoff wall of phase Ⅱ cofferdam of Datengxia Water Conservancy Project
下载PDF
导出
摘要 本文阐述了大藤峡水利枢纽工程二期围堰防渗墙工期紧、成墙造孔难度大、施工强度高的特点,合理分析了施工工期,提出了防渗墙分区施工设计方案,最大限度地满足技术可行、经济合理等方面的要求,为工程早日发挥效益奠定了基础。 In this paper,the construction period of the cofferdam cutoff wall of Ⅱ phase of the Datengxia Water Conservancy Project is tight,the dificulty of wall construction and hole construction,and the construction intensity is high.The construction period is reasonably analyzed,and the partition construction design scheme of cutoff wall is proposed to meet the requirements of technical feasibility and economic rationality to the maximum extent,so as to lay a solid foundation for the project to bring benefits into play as soon as possible.
作者 程振 张新荣 CHENG Zhen;ZHANG Xin-rong
出处 《东北水利水电》 2023年第12期3-5,71,共4页 Water Resources & Hydropower of Northeast China
关键词 二期围堰 防渗墙 施工方案 大藤峡水利枢纽 phase Ⅱ cofferdam cutoff wall construction scheme Datengxia Water Conservancy Project
  • 相关文献

参考文献1

二级参考文献2

同被引文献7

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部