摘要 以三四沟水电站隧洞塌方处理方案为例,阐述了利用塌方渣体作为支撑、采用泵送混凝土对隧洞塌方空腔进行一定厚度充填的方式以减小塌方腔体、约束塌体周边围岩变形并在隧洞上部形成封闭,最终起到超前支护的作用,进而为保证隧洞内塌方体的处理及后续隧洞的支护工作提供安全操作空间,所取得的经验可为类似隧洞塌方处理方案的选择借鉴。 Taking the tunnel collapse treatment plan of Sansigou Hydropower Station as an example,the article explains how to use the collapsed slag body as a support and use pumped concrete to fill the collapsed cavity of the tunnel with a certain thickness to reduce the collapsed cavity,restrain the surrounding rock around the collapsed cavity,and form a closure in the upper part of the tunnel which ultimately plays the role of provide advanced support,thereby,providing a safe operating space for ensuring the treatment of the collapsed body in the tunnel and subsequent tunnel support work.And it may provide reference for the selection of similar tunnel collapse treatment plans.
作者 刘彤 LIU Tong(Sichuan Provincial Water Resources Planning and Research Institute,Chengdu Sichuan 610072)
出处 《四川水力发电》 2023年第S02期58-61,86,共5页 Sichuan Hydropower
关键词 三四沟水电站 隧洞 塌方处理 充填混凝土 泵送混凝土 塌方体超前支护 Sansigou Hydropower Station Tunnel Tunnel collapse treatment Filling concrete Pumped concrete Advance support for collapsed bodies
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部