摘要
以合肥滨湖时代广场C2栋高层建筑为依托,对该栋建筑桩基础进行了设计,经过对拟建场地的土层情况、水文地质条件及场地与地基的地震效应的分析,并按照相关规范及评审专家意见,确定采用大直径挖孔扩底灌注桩基方案,经计算分析表明,大直径挖孔扩底灌注桩以桩端的端阻力为主,不考虑侧摩阻力。
Based on C2 high-rise building of Binhu Times square in Hefei city,the paper designs the building pile foundation.Through analyzing proposed field soil condition,hydraulic condition,and seismic effect between the proposed field and the foundation,according to relevant norms and assessment experts proposals,it determines to adopts the scheme of large-diameter expanded-bottom cast-in-place pile.The calculating analysis shows that the large-diameter expanded-bottom cast-in-place pile takes the pile-end resistance as the orientation without considering the side-friction resistance.
作者
余勇
陈焰周
肖飞
徐必兵
Yu Yong;Chen Yanzhou;Xiao Fei;Xu Bibing(Central South Architectural Design Institute Co.,Ltd.,Wuhan Hubei 430071,China)
出处
《山西建筑》
2023年第24期71-73,共3页
Shanxi Architecture
关键词
超高层
大直径
挖孔扩底灌注桩
端阻力
super high-rise
large-diameter
expanded-bottom cast-in-place pile
end resistance