从我国工程清单体系造价构成和我国与国际投标阶段工程造价的区别进行了阐述,对国际工程投标报价构成中的成本、待摊费用以及国内外费用差别分析与修正、风险分析以及盈亏平衡分析与修正做了简要介绍。
From the difference in the composition of the project cost of the project list and the construction cost of the project during the international bidding stage,the cost,prepaid expenses,the analysis and amendments of the cost of the domestic and foreign expenses,the risk analysis and the profit loss balance analysis and the profit and loss balance analysis and amendment of the composition of the project bidding quotation are briefly introduced.
作者
刘永江
王泽浩
刘奕彤
陈磊
LIU Yong-jiang;WANG Ze-hao;LIU Yi-tong(Harbin Power System Engineering&Research Institute Co.,Ltd.;CMEC)
出处
《电站系统工程》
2023年第6期79-81,共3页
Power System Engineering
关键词
工程
造价
报价
计算
engineering
cost
quotation
calculation