某渠道水毁修复工程设计主要内容

Main Content of Flood Damage Repair Project Design of a Channel
原文传递
导出
摘要 某渠道水毁修复工程设计内容为堤防及堤坡修复工程、堤防填筑工程、堤防护砌工程、涵管拆除及堤防恢复工程、防汛抢险道路工程等,主要工程量为堤防恢复2处,总长120 m,G107桥下堤防40 m,黄土岗堤防80 m;堤防护砌5处,总长度1.80 km;堤坡修复422 m,雨淋沟整修10000 m^(3);拆除废弃涵管5座;堤防回填整修5处;重建防汛抢险道路总长8.22 km。 The design content of a canal water damage restoration project includes dike and embankment slope restoration engineering,embankment filling engineering,embankment protection masonry engineering,culvert demolition and embankment restoration engineering,flood prevention and rescue road engineering,etc.The main works are the restoration of 2 levees,with a total length of 120 m,40 m of embankment under G107 bridge,and 80 m of Huangtugang embankment.There are 5 embankment protection blocks with a total length of 1.80 km.422m of embankment,10,000 m^(3)of rain ditch are repaired.5 abandoned culverts are demolished.5 embankment backfill are repaired.The total length of flood prevention and rescue roads are 8.22 km.
作者 罗新华 LUO Xinhua(Yongcheng Water Conservancy Engineering Technical Service Center,Yongcheng 476600,China)
出处 《河南水利与南水北调》 2023年第10期81-82,共2页 Henan Water Resources & South-to-North Water Diversion
关键词 堤防 修复 工程设计 主要内容 embankment repair design main content
  • 相关文献

参考文献4

二级参考文献5

共引文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部