某建设项目节水评价确定分析范围为城区(原行政区),面积为970 km^(2)。根据项目性质、取用水特点,结合水资源条件及系统节能运行控制模式、绿色节能和智慧控制节能自控设计等节水现状,对负荷指标对比、机组水平、水量平衡、节水潜力等进行合理充分分析。通过综合分析确定某建设项目采用复合式水源热泵能源系统,控制采用“智慧控制节能自控设计及能源监控系统”,系统机组配置方案和运行模式有利于发挥水源热泵机组高效节能、绿色环保的优势。
The water-saving evaluation of a construction project was determined to cover an urban area,which is the former administrative region,with an area of 970 km'.According to the nature of the project,the characteristics of water consumption,combined with the water resource conditions and system energy-saving operation control mode,green energy saving and intelligent control energy-saving automatic control design and other water saving situation,load index comparison,unit level,water balance,water-saving potential were reasonably and fully analyzed.Through comprehensive analysis,it is determined that a construction project adopted a composite water source heat pump energy system,and the control adopted intelligent control energy-saving automatic control design and energy monitoring system.The configuration scheme and operation mode of the system unit were conducive to giving full play to the advantages of high efficiency,energy saving and green environmental protection of water source heat pump unit.
作者
巩志红
GONG Zhihong(Henan Zhumadian Banqiao Reservoir Administration Bureau,Henan Zhumadian 463000)
出处
《河南水利与南水北调》
2023年第10期135-136,共2页
Henan Water Resources & South-to-North Water Diversion
关键词
能源
控制模式
节水潜力
系统
energy
control mode
potential for water savings
system