基于BIM的多专业协同设计研究

Research on Multi-professional Collaborative Design Based on BIM
下载PDF
导出
摘要 文章分析了BIM在建设项目各阶段的价值,致力于研究设计阶段采用BIM正向设计的必要性,以打破BIM在项目各阶段流通的的壁垒。分析项目结合业主要求以确定模型交付标准,结合企业运行机制以建立项目级别的分阶段的模型精度,建议采用工作集的方式,划定协同专业指令等级,从方案设计(模拟分析从而使得方案设计对标绿色建筑标准)、机电管线综合排布、模型检查调整等方面谨慎推进,向建设单位交付全专业(建筑、结构、机电安装)的“零碰撞”模型,尽可能达到施工精度的模型交付,从而消除施工图纸的“错、漏、碰、缺”问题。 This paper analyzes the value of BIM in each stage of the construction project,and strives to study the necessity of adopting BIM forward design in the design stage to break the barriers of BIM in each stage of the project.project is analyzed in combining with the owner requirements to determine model delivery standard,in combining with the enterprise operation mechanism to establish the project level,phased model accuracy,to suggest the method of work set,to designate collaborative professional instruction levels,from the scheme design(simulation analysis,so as to make the scheme design for the green building standards),electromechanical pipeline comprehensive arrangement,model check adjustment,delivery all professional(construction,structure,mechanical and electrical installation)"zero collision"model to the construction unit,as far as possible to achieve the construction accuracy of model delivery,so as to eliminate the of"wrong,leakage,touch,lack"problems of construction drawings.
作者 涂中强 师伟凯 TU Zhongqiang;SHI Weikai(Jiangsu Vocational Institute of Architectural Technology,Xuzhou 221116,China;Jiangsu Collaborative Innovation Center for Building Energy Saving and Construction Technology,Xuzhou 221116,China;Jiangsu Jin Ao Construction Technology Co.,Ltd.,Xuzhou 221116,China)
出处 《科技创新与生产力》 2023年第11期123-126,132,共5页 Sci-tech Innovation and Productivity
基金 2018度江苏省建设系统科技项目(指导类)(2018ZD336) 江苏建筑节能与建造技术协同创新中心项目(SJXTQ1604)。
关键词 BIM 协同设计 机电安装 BIM collaborative design electromechanical installation