期刊文献+

高落差长距离引水工程设置消能电站的工程实践

Engineering practice of setting energy dissipating power station in high drop long distance diversion project
下载PDF
导出
摘要 重力流引水工程,尾部一般采用调流阀实现流量控制和消能。鄂西南某引水工程自水库取水输送至城区主力水厂,输送距离约25km,水库常水位与水厂高程相差约280m,若仍采用调流阀消能将造成极大水头浪费。针对高落差实际情况,本工程在中途设置消能电站进行减压,电站装机容量8MW,年发电量达6235万kW·h,单位电能投资仅1.6元/(kW·h),充分利用了水资源,具有良好的经济效益。 For gravity flow diversion projects,pressure regulating valves are generally used at the tail to achieve flow control and energy dissipation.A water diversion project in southwestern Hubei Province takes water from the reservoir and transports it to the main water plant in the urban area.The transportation distance is about 25 km.The difference between the normal water level of the reservoir and the elevation of the water plant is about 280 m.If the pressure regulating valve is still used for energy dissipation,it will cause a great waste of water head.In view of the actual situation of high drop,energy dissipation power stations are set up in the middle of the project to reduce pressure.The installed capacity of the power station is 8 MW,the annual power generation is 62.35 million kW·h,and the investment in unit electric energy is only¥1.6/(kW·h),which makes full use of water resources and has good economic benefits.
作者 刘臣 李国洪 樊雪红 赛常胜 李春龙 何小龙 杨明 陈波 LIU Chen;LI Guohong;FAN Xuehong;SAI Changsheng;LI Chunlong;YANG Ming;CHEN Bo(Central&Southern China Municipal Engineering Design and Research Co.,Ltd.,Wuhan 430010,China;Guangdong Yuehai Water Investment Co.,Ltd.,Shenzhen 518021,China;Enshi Yongyang Water Conservancy and Power Survey and Design Co.,Ltd.,Enshi 445000,China)
出处 《给水排水》 CSCD 北大核心 2023年第11期128-131,143,共5页 Water & Wastewater Engineering
关键词 引水工程 调流阀 重力流 高落差 消能电站 无压引水隧洞 Diversion works Flow regulating valve Gravity flow High drop Energy dissipation station Non pressure headrace tunnel
  • 相关文献

参考文献2

二级参考文献6

共引文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部