摘要
文章以某城市污水处理厂的电气工程施工与自动化控制工程为研究对象,结合该污水处理厂建设情况,以BP神经网络和遗传算法为计算方式计算了该污水处理厂的电能消耗,并以控制方式、控制站的构建两个角度为核心提出了自动化控制的设计路径,以期为城市污水处理厂中的电气工程施工和自动化控制提供一定的参考。
This paper takes the electrical engineering construction and automation control engineering of an urban sewage treatment plant as the research object,combines the construction situation of the sewage treatment plant,with the power consumption of the sewage treatment plant was calculated by BP neural network and genetic algorithm.The design path of automatic control is proposed based on the control mode and the construction of control station,in order to provide a certain reference for the electrical engineering construction and automatic control of urban sewage treatment plant.
作者
李婀茂
LI Namao(Guangdong Shunhe Water Investment and Construction Co.,Ltd.,Foshan 528300,China)
关键词
城市污水处理厂
电气工程施工
自动化控制
urban sewage treatment plant
electrical engineering construction
automatic control