摘要 结合实际工程施工资料,分析沿海地区不均匀地质下大体量桩基施工,从多单位交叉施工协调,多种桩基类型的先后施工顺序,施工穿插的施工组织,以及施工时场内交通组织,特殊部位的场地处理,桩基检测的分区提前插入等进行描述,明确如何在有限场地内进行大体量桩基施工,从而实现不同区域、不同桩型同步施工,节约工程工期。 Based on the actual engineering construction data,this paper analyzes the massive pile foundation construction under the uneven geology in the coastal areas,from the cross-construction coordination of multiple units,construction sequence of multiple pile foundation types,construction interspersed construction organization;The traffic organization in the field,the site treatment of special parts,and the partition and inserted in advance of pile foundation detection,to determine how to carry out large-volume pile foundation construction in a limited site,so as to realize the synchronous construction of different areas and different pile types,save the project duration.
作者 李聪聪 杨高勇 唐明成 张乐乐 袁龙彬 LI Cong-cong;YANG Gao-yong;TANG Ming-cheng;ZHANG Le-le;YUAN Long-bin(Zhuhai Branch ofChina Construction Second Engineering Bureau Co.Ltd.South China Company,Zhuhai 519000,China)
出处 《工程建设与设计》 2023年第23期207-209,共3页 Construction & Design for Engineering
关键词 大体量多种桩型施工 施工穿插 施工组织 平面布置 Jlarge volume and multiple pile types construction construction intersperse construction organization planelayout
  • 相关文献

二级参考文献4

共引文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部