期刊文献+

济南黄河隧道工程北岸工作井基坑开挖施工研究 被引量:1

Study on the Foundation Pit Excavation of North Bank of Ji'nan Yellow River Tunnel Project
下载PDF
导出
摘要 依托济南黄河隧道北岸工作井基坑工程,对基坑开挖施工过程进行研究,依据工程实际提出基坑开挖和支护遵循“开槽支撑、先撑后挖、分层开挖、严禁超挖”的原则,有效降低基坑开挖过程产生的风险,保证了基坑施工的安全性。 Relying on the construction of the work well foundation on the north bank of Ji'nan Yellow River Tunnel,this study investigates the excavation process of the foundation pit.Based on actual engineering conditions,it proposes excavation and support principles for the foundation pit,including“slotting support,supporting before digging,layered excavation,and strict prohibition of over-excavation”.These measures can effectively reduce risks during the excavation process and ensure the safety of pit construction.
作者 肖洪斌 XIAO Hong-bin(China Railway 14th Bureau Group Shield Engineering Co.Ltd.,Nanjing 211800,China)
出处 《工程建设与设计》 2023年第23期226-228,共3页 Construction & Design for Engineering
关键词 工作井基坑 基坑开挖 施工风险 work well foundation pit excavation offoundation pit construction risk
  • 相关文献

参考文献5

二级参考文献65

共引文献367

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部