摘要
苏州河防汛墙是上海市防汛的第一道防线,也是最重要的一道屏障之一,近年来为解决防汛墙高程欠缺、结构欠稳、墙体未达标等问题做了众多方案设计。工程投资是项目的必要组成部分,也是方案比选必不可少的内容,如何在工程前期阶段缺少资料的情况下确定合理的投资就显得非常重要。本文对众多防汛墙断面的技术经济指标进行总结,以期能够为苏州河防汛墙前期阶段投资控制提供参考。
The Suzhou Creek Flood Control Wall is the first and one of the most important barriers for flood control in Shanghai.Many programs have been designed in recent years to address the lack of elevation,structural instability and substandard walls of flood control walls.Engineering investment is a necessary part of the project and an essential element of programme comparison.How to determine a reasonable investment in the absence of information at the pre-construction stage becomes very important.By summarizing the technical and economic indicators of numerous flood wall sections,this paper aims to provide reference for the investment control of Suzhou Creek flood control wall in the preliminary stage.
作者
张绍辉
ZHANG Shao-hui(Shanghai Municipal Engineering Cost Consulting Co.,Ltd.,Shanghai 200092,China)
出处
《价值工程》
2023年第35期23-25,共3页
Value Engineering
关键词
防汛墙
技术经济指标
造价指标
flood wall
technical and economic indicators
cost indicator