期刊文献+

单转向架更换装置静强度分析及试验验证

Analysis and Testing Verification of the Static Strength of the Single Bogie Replacement Device
下载PDF
导出
摘要 单转向架更换装置进行更换转向架作业时需要承受较大的载荷,对设备的强度有很高的要求。文章针对适用于临修作业的单转向架更换装置关键受力机构进行了静强度计算,并进行了试验验证。理论计算和试验结果都表明,单转向架更换装置静强度满足使用要求,并具有较大的安全余量。 The single bogie replacement device has to bear a large load during the operation of bogie replacement,so the requirement for its strength is very high.This article calculates the static strength of the critical force-bearing mechanism of the single bogie replacement device applicable to the temporary repair and verifies the result by testing.Both results of the theoretical calculation and the test show that the static strength of the single bogie replacement device comply with the operating requirement and has a large safety margin.
作者 伊建辉 李娜 潘俊 毕鑫淼 孟艳红 YI Jianhui;LI Na;Pan Jun;BI Xinmiao;MENG Yanhong(CRRC Qingdao Sifang Rolling Stock Research Institute Co.,Ltd.,Qingdao 266031,China)
出处 《铁道车辆》 2023年第6期99-102,共4页 Rolling Stock
关键词 转向架更换装置 强度分析 试验验证 临修 bogie replacement device strength analysis testing verification temporary repair
  • 相关文献

参考文献6

二级参考文献21

共引文献41

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部