期刊文献+

邻近既有桥梁的海域大面积筑岛填砂施工技术

Construction technology of large-area island construction andsand filling in sea adjacent to existing bridges
下载PDF
导出
摘要 针对临近既有桥梁结构的大面积填砂施工存在的效率低、控制变形难等问题,结合深中通道东人工岛工程,基于数值模拟确定了桥下填筑顺序及方法,阐述回填筑岛关键施工技术,并通过监测数据、拱淤扫测验证施工效果。结果表明,“桩内-砂被-横桥向左/右交替”回填原则结合分砂器等装置可将既有桥梁变形控制在±5 mm内,降低66.7%的拱淤量;堆载反压、反方向卸载的变形纠偏效果显著;回填砂工程量须重点考虑回填料密实、含泥量、岛壁滤层流失等因素,本工程试验段回填砂流失率为4.21%。 In view of the problems of low efficiency and difficult deformation control in the construction of large-area sand filling near the existing bridge structure,combined with the east artificial island project of Shenzhen-Zhongshan Link,this paper determines the sequence and method of filling under the bridge based on numerical simulation,explains the key construction techniques of backfilling island construction,and verifies the construction effect by monitoring data and arch silt sweeping.The results show that the backfilling principle of“pile-sand quilt-cross-bridge left right alternating”,combined with sand splitter and other devices can control the deformation of the existing bridge within±5 mm and reduce 66.7%of arch siltation.The deformation correction effect of pile back pressure and unloading in the opposite direction is significant.The backfill sand volume needs to focus on the backfill density,mud content,and the loss of the filter layer of the island wall.The backfill sand loss rate in the test section of this project is 4.21%.
作者 祝阿龙 侯禹辰 罗风权 卢金栋 王浩然 ZHU Along;HOU Yuchen;LUO Fengquan;LU Jindong;WANG Haoran(China Railway Tunnel Group Three Co.,Shenzhen 518000,China;China Railway Tunnel Consultants Co.,Ltd.,Guangzhou 511458,China)
出处 《水运工程》 北大核心 2023年第12期165-170,197,共7页 Port & Waterway Engineering
基金 中铁股份公司重大科研课题项目(20190703) 中铁隧道局重大科研课题项目(201824)。
关键词 深中通道 邻近既有桥梁 大面积筑岛 填砂 Shenzhen-Zhongshan Link adjacent to existing bridges large-area island construction sand filling
  • 相关文献

参考文献9

二级参考文献92

共引文献108

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部