驮英水库消能防冲护岸设计 被引量:1

Design of energy dissipation and erosion-control bank revetment for Tuoying Reservoir
下载PDF
导出
摘要 驮英水库采用溢洪道+泄洪洞联合泄洪的泄洪方式,泄洪时水流条件极其复杂,溢洪道及泄洪洞泄洪时产生的冲坑很深,对护岸边坡的稳定造成了严重的威胁,又因溢洪道及泄洪洞布置位置距离大坝及坝后发电厂房均接近,联合泄洪产生的影响对整个水库建筑物的安全均产生了影响,故本工程对冲刷严重护岸段进行桩基防护,以确保水库枢纽安全。 The flood-relief structures of Tuoying Reservoir consist of flood spillway and spillway tunnel.The water flow conditions during flood discharge are extremely complicated.Flood discharge may render very deep scour holes in the flood spillway and tunnel,which will seriously threaten the stability of bank revetment.Furthermore,the flood spillway and tunnel are close to the main dam and downstream powerhouse,and the joint flood discharge affect the safety of whole reservoir structures,so pile foundation protection is designed for the bank revetment sections subject to serious scouring to ensure the safety of reservoir project.
作者 张祖航 董蔷薇 ZHANG Zu-hang;DONG Qiang-wei(Beihai Hehai Water&Power Design Institute Co.,Ltd.,Beihai 536000,China;Nanning College for Vocational Technology,Nanning 530007,China)
出处 《广西水利水电》 2023年第6期58-62,共5页 Guangxi Water Resources & Hydropower Engineering
关键词 护岸 冲刷 冲坑深度 桩基护岸 防淘墙 驮英水库 bank revetment scouring depth of scour hole pile foundation bank revetment anti-scouring wall Tuoy⁃ing Reservoir
  • 相关文献

同被引文献8

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部