通过对老挝南公1水电站工程施工期坝体沉降量、重型振动碾碾压振动试验的研究分析,绘制相应的关系曲线。通过数据对比及相关曲线分析得在重型振动碾碾压下,有助于提高面板堆石坝坝体碾压密实度,降低因碾压不实导致的坝体不均匀沉降。
Research and analysis of dam settlement and rolling vibration test of heavy vibrating roller were conducted during the construction period of Laos Nangong I Hydropower Project.Corresponding relationship curves were drawn.By comparing data and analyzing relevant curves,it is concluded that rolling with heavy vibrating roller is helpful to improve the rolling compactness of the face-slab rockfill dam body and reduce the uneven settlement of the dam body due to incomplete rolling.
作者
刘俊宏
王吉朝
LIU Jun-hong;WANG Ji-chao(Guangxi Vocational College of Water Resources and Electric Power,Nanning 530023,China;Investigation and Design Institute of SINOHYDRO Bureau 3 Co.,Ltd.,Xian 710024,China)
出处
《广西水利水电》
2023年第6期99-103,共5页
Guangxi Water Resources & Hydropower Engineering
关键词
重型振动碾
试验
研究分析
累计沉降量
累计沉降率
南公1水电站
heavy vibrating roller
test
research and analysis
cumulative settlement
cumulative settlement rate
Nangong I Hydropower Project