摘要
这是一篇矿物加工工程领域的论文。某金矿的全泥氰化尾渣含金0.45 g/t,金主要以硫化物包裹金形式存在,且主要分布于+0.037 mm粒级中。经过分级预处理后,对+0.037 mm矿样,在磨矿细度-0.037 mm 15%条件下,采用一次粗选两次扫选三次精选闭路实验流程,获得含金21.25 g/t,作业回收率72.27%的金精矿产品。
This is an essay in the field of mineral processing engineering.Cyanide tailings of a gold mine contain gold 0.45 g/t,and the gold mainly exists in the form of vulcanized gold and is mainly distributed in coarse particles.After the classification treatment,for the+0.037 mm ore sample,under the condition of grinding fineness-0.037 mm content of 15%,by using floatation flowsheet“one roughing-two scavenging-three cleaning”,the gold concentrate with the grade of 21.25 g/t,and the operation recovery 72.27%.The Result shows that the cyanide tailings can be comprehensively recovered.
作者
欧阳超
潘高产
Ouyang Chao;Pan Gaochan(Hunan Research Institute for Nonferrous Metals Co.,Ltd.,Changsha,Hunan,China)
出处
《矿产综合利用》
CAS
北大核心
2023年第6期159-163,共5页
Multipurpose Utilization of Mineral Resources
关键词
矿物加工工程
氰化尾渣
金矿浮选
尾矿再选
综合回收
Mineral processing engineering
Cyanide residue
Gold ore flotation
Tailings reconcentration
Comprehensive recovery