摘要
牵引变电所通常配置一主一备两台变压器,传统的检修方式为单组退出进行维修,安全性低,存在检修死角,且维修耗时较长。本文以电气化铁路是否具备越区供电能力为分析计算对象,搭建了直供加回流牵引供电方式下的MATLAB仿真模型,结合既有线路具体参数及实际馈线取流,分析牵引所越区后最大电压损失是否符合要求。
The traction substation usually allocates two transformers of one main and one standby.The traditional maintenance mode is that the single set of transformer will exit for maintenance,it is low in terms of safety,and it has dead angle and time consuming for maintenance.Based on the analysis and calculation of whether the electrified railway has the capability of over-zone power supply,the paper establishes the MATLAB simulation model under traction power supply mode with direct supply plus return current,combined with the specific parameters of the existing line and the actual current collection of feeders,analyzes whether the maximum voltage loss of the traction substation after the over-zone power supply is meeting the requirements.
出处
《电气化铁道》
2023年第S02期107-111,共5页
Electric Railway
基金
中国国家铁路集团有限公司“既有普速线牵引供电能力与动车组运行匹配性研究试验项目(子课题3)”(20211509)。
关键词
电气化铁路
供电能力实测
仿真验证
越区供电能力
electrified railway
actual test of power supply capability
simulation verification
capability of over-zone power supply