摘要
深暗立井掘进施工不同于普通立井,措施工程量大,凿井设备拆装复杂,结合盲副井的断面大(井筒直径7.7m)、深井及相关碉室之间布置密集,采用“机械化作业线一次成井法施工技术”科学合理的设备布置和选型,为深暗立井施工、加快工期及安全提供保障。
Construction of deep underground shaft is different from that of ordinary shaft,it brings the problems including huge construction amount and complexity of dismantling drlling equipment.Combined with large section of blind shaft(diameter 7.7m)and dense arrangement of deep shafts and chambers,"one-time shaft formation through mechanized operation line"is adopted,and scientific and reasonable equipment layout and equipment selection is also carried out,which provides a guarantee for the deep underground vertical shaft construction,speeding up the construction period and safety.
作者
张秉恒
王刚
龚自强
Zhang Bing-heng;Wang Gang;Gong Zi-qiang
出处
《金川科技》
2023年第4期9-11,共3页
Jinchuan Science and Technology
关键词
深暗立井
一次成井
施工技术
机械化
deep underground vertical shaft
one-time shaft formation
construction technology
mechanization