摘要
为解决闸、站、桥结合式泵站复杂进流条件下前池易产生偏流的问题,以某闸站工程为研究对象,采用物理模型试验和数值模拟相结合的方法,分析不同优化措施下面层流场和进水流道断面的流速均匀度,确定最佳优化方案.研究表明:通过增加导流墩头、整流柱、镂空底坎等组合整流措施,可有效消除复杂工程布置下前池的偏流和进水池的漩涡,为类似工程提供借鉴和参考.
To solve the problem that the front pool is prone to flow bias under complex inlet conditions of sluice,station and bridge pump station,a sluice-pump station project is taken as the research object,and the velocity uniformity of laminar flow field and inlet channel section under different optimization measures is analyzed by physical model test and numerical simulation,and the optimal optimization scheme is determined.The research shows that by adding the combined rectification measures such as the head of the diversion pier,the rectifier column and the hollow bottom can effectively eliminate the deflection of the front pool and the vortex of the inlet pool under the complex arrangement of the project.The proposed optimization scheme can provide reference for similar projects.
作者
奚斌
陈志刚
陈叶欣
沈世煊
张雄伟
徐健
王欣昱
XI Bin;CHEN Zhigang;CHEN Yexin;SHEN Shixuan;ZHANG Xiongwei;XU Jian;WANG Xinyu(School of Hydraulic Science and Engineering,Yangzhou University,Yangzhou 225127,China)
出处
《扬州大学学报(自然科学版)》
CAS
北大核心
2023年第6期73-78,共6页
Journal of Yangzhou University:Natural Science Edition
基金
国家自然科学基金资助项目(51541912)
“十二五”国家科技支撑计划资助项目(210BOD08B03-2).
关键词
泵站
前池
侧向进流
整流
数值模拟
流态优化
pumping station
forebay
lateral inflow
rectification
numerical simulation
optimization of flow pattern