1LEE H S,MURTHY S S,HAIDER S W,et al.Primary production scheduling at steel making industries[J].IBM J Res Develop,1996,40 (2 ):231-252.
2MANOHAR P A,SHIVATHAYA S S,FERRY M,et al.Development of an integrated system for designing steelmaking aim compositions [A].Proceedings of the Second International Conference on Intelligent Processing and Manufacturing of Materials IPMM '99 [C].Hawaii: IE
3JAIN S,CHAN S.Experiences with backward simulation based approach for lot release planning [A].Proceedings of the 1997 Winter Simulation Conference [C].Atlanta: IEEE,1997.773-780.
4GU T L,BABRI P A.Timed petri-net representation for short term scheduling of multi-product batch plants[A].Proceedings of the American Control Conference[C].Hyatt Regency San Diego: IEEE,1999.6: 4 092-4 096.