期刊文献+

滇西北某矿山井下泥石流成灾机理的数值模拟研究

Numerical Simulation Study on Disaster Mechanism of Underground Debris Flow at a Mine in Northwest Yunnan
下载PDF
导出
摘要 某矿山位于滇西北,采用自然崩落法开采,随着开采深度的增加及地表塌陷范围的不断扩大,极易发生井下泥石流事故,对井下开采过程中的人与设备的安全造成严重威胁。因此,有必要对其井下泥石流的成灾机理进行探索,从而预测评估发生泥石流灾害的可能性,采取科学合理的防治措施,最大限度地降低井下泥石流发生的规模,避免对矿山开采造成影响。该文采用PFC数值模拟软件,对井下采矿的过程进行模拟,通过分析模拟的结果,从而得出结论,并提出相对应的防治措施。 Located in the northwest of Yunnan province,a certain mine employs the natural collapse method for mining.As mining operations reach greater depths and surface subsidence expands,the risk of underground mudslides increases,posing a serious threat to personnel and equipment safety.It becomes essential to investigate the mechanism behind underground debris flow disasters,which will enable us to predict and evaluate their occurrence,implement scientifically reasonable preventive measures,minimize the scale of debris flows,and avoid disruptions to mining activities.This study utilizes PFC numerical simulation software to simulate the underground mining process,analyze the simulation results,draw conclusions,and propose corresponding prevention and control measures.
作者 王旭 李阳 魏庆喜 王必成 朱登云 WANG Xu;LI Yang;WEI Qingxi;WANG Bicheng;ZHU Dengyun(Kunming Prospecting Design Institute of China Nonferrous Metals Industry Co.,Ltd.,Kunming,Yunnan 650051,China)
出处 《有色金属设计》 2023年第4期12-16,共5页 Nonferrous Metals Design
关键词 井下泥石流 成灾机理 PFC 数值模拟 Underground debris flow Disaster formation mechanism PFC Numerical simulation
  • 相关文献

参考文献2

二级参考文献26

共引文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部