大型EPC公建项目电气设计与现场施工安装快速建造技术研究

Research on Rapid Construction Technology for Electrical Design and On-Site Construction Installation in Large-Scale EPC Public Construction Projects
下载PDF
导出
摘要 研究探讨EPC(工程、采购、施工)总承包模式在建筑行业中的应用,解决大型公建项目中设计对接安装接口和管理的问题,提高了项目整体效益和质量。以嘉兴火车站这一大型政治红色公建项目为例,详细阐述EPC总承包模式下电气设计乃至机电设计与现场施工安装方面的快速建造技术及实践经验。证明了EPC总承包模式能够有效统筹规划和协同运作整体项目,缩短工期,增效降本。 This study explores the application of the EPC(engineering,procurement,construction)general contracting model in the construction industry to solve the problems of design interface,installation interface,and management in large-scale public construction projects,thereby improving the overall efficiency and quality of the project.Taking Jiaxing Railway Station,a large-scale political and red public construction project,as an example,this article elaborates on the rapid construction technology and practical experience in electrical design,even electromechanical design,and on-site construction and installation under the EPC general contracting model.It is proved that the EPC general contracting model can effectively coordinate and plan the overall project,shorten the construction period,and increase efficiency and reduce costs.
作者 徐晓明 XU Xiaoming(Tongji Architectural Design(Group)Co.,Ltd.,Shanghai 200092,China)
出处 《现代建筑电气》 2023年第12期49-51,56,共4页 Modern Architecture Electric
关键词 EPC 工程总承包 电气设计 快速建造 EPC Engineering Procurement Construction Electrical Design Rapid construction
  • 相关文献

二级参考文献3

共引文献20

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部