期刊文献+

安徽某涂装厂搬迁地块环境调查与风险评估

Environmental Investigation and Risk Assessment of a Painting Factory in Anhui Province
下载PDF
导出
摘要 以安徽某涂装厂搬迁地块为例,进行地块的环境污染调查与风险评估,调查结果显示:土壤样品中六价铬的检测浓度超标,存在不可接受的致癌风险和非致癌危害,需要修复污染土壤面积为1008.78m^(2),修复方量为3613m^(3),建议采取化学还原的固化稳定化技术进行修复治理。 Taking the relocation of a painting factory in Anhui province as an example,the environmental investigation and risk assessment were carried out,the survey results show that the detection concentration of hexavalent chromium in soil samples exceeds the standard,there are unacceptable carcinogenic risks and non-carcinogenic hazards that require appropriate risk management or remediation measures.The area to be repaired is 1008.78 m^(2),and the volume of the repaired prescription is about 3613 m^(2).It is suggested that chemical reduction stabilization/solidification technology should be adopted for repairing treatment.
作者 陈姣 Chen Jiao(Anhui Guozhen Environmental Remediation Co.,Ltd.,Anhui,230088)
出处 《当代化工研究》 CAS 2024年第2期37-39,共3页 Modern Chemical Research
关键词 涂装厂 六价铬 环境调查 风险评估 painting factory hexavalent chromium environmental investigation risk assessment
  • 相关文献

参考文献6

二级参考文献62

  • 1曾纪勇,赵艳玲,李建华,高杨,付馨,何厅厅,王亚云.重金属污染场地再利用的健康风险评估研究[J].工业安全与环保,2013,39(4):59-62. 被引量:6
  • 2陈鸿汉,谌宏伟,何江涛,刘菲,沈照理,韩冰,孙静.污染场地健康风险评价的理论和方法[J].地学前缘,2006,13(1):216-223. 被引量:159
  • 3武红叶,曾明.六价铬致癌机制的研究进展[J].癌变.畸变.突变,2006,18(6):491-493. 被引量:17
  • 4赵娜娜,黄启飞,易爱华,王琪.我国污染场地的管理现状与环境对策[J].环境科学与技术,2006,29(12):39-40. 被引量:40
  • 5US Environmental Protection Agency. Calculating upper confidence limits for exposure point concentrations at hazardous waste sites [ R ]. Washington DC: Office of Emergency and Remedial Response,2002 : 1-22.
  • 6US Environmental Protection Agency. A supplemental guidance to rags : calculating the concentration term [ R ]. Washington DC : Office of Solid Waste and Emergency Response,1992:1-8.
  • 7环境保护部.污染场地风险评估技术导则:征求意见稿[EB/OL].北京:环境保护部,2009[2012-08-09].http://www.mep.gov.cn/gkml/hbb/bgth/200910/:0091022-175070.htm.
  • 8US Environmental Protection Agency. Risk assessment guidance for superfund: volume I human health evaluation manual (part A) [ R ]. Washington DC: Office of Emergency and Remedial Response, 1989 : 110-117.
  • 9US Environmental Protection Agency. Data quality objectives process for hazardous waste site investigations [ R ]. Washington DC : Office of Environmental Information ,2000 : 1.-68.
  • 10US Environmental Protection Agency. Data quality evaluation statistical toolbox: user's guide [ R ]. Washington DC : Office of Research and Development, 1997 : 1-20.

共引文献26

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部