摘要
大型钢厂在开展冶金工程时要投入巨大的人力、物力和财力,工程造价控制的难度较大,若不能在各环节进行成本控制,将导致工程造价失控。基于此,重点对大型钢厂冶金工程造价的控制难点进行分析,并制定相应的控制措施,有效控制大型钢厂冶金工程造价,进而提升大型钢厂的效益。
Large steel mills need to invest a huge amount of manpower,material resources,and financial resources in carrying out metallurgical engineering,making it difficult to control engineering costs.If cost control cannot be carried out at all stages,it will lead to uncontrolled engineering costs.Based on this,the difficulties in controlling the cost of metallurgical engineering in large steel mills are analyzed,and corresponding control measures are formulated to effectively control the cost of metallurgical engineering in large steel mills and improve their economic benefits.
作者
霍兆霞
Huo Zhaoxia(Beijing Metallurgical Engineering Co.,Ltd.,Beijing 100080,China)
出处
《山西冶金》
CAS
2023年第11期266-268,共3页
Shanxi Metallurgy
关键词
大型钢厂
冶金工程造价
控制难点
控制措施
large steel mills
metallurgical engineering cost
control difficulties
control measures