摘要
以某高速公路特大桥预应力混凝土箱梁挂篮施工为背景,对连续箱梁挂篮施工流程进行了分析;在合理采用挂篮施工工艺基础上,提出了挂篮行走的安全保证措施和专门的挂篮防倾覆措施,并对挂篮施工高空作业和已完梁段邻边做了安全设置,确保了预应力混凝土连续箱梁挂篮施工质量和安全稳定性。
Based on the construction of hanging basket for prestressed concrete box girder of an expressway bridge,the construction process of hanging basket of continuous box girder is analyzed.On the basis of reasonable application of hanging basket construction technology,the safety guarantee measures of hanging basket walking and the special hanging basket anti-overturning measures are put forward.And to the hanging basket construction high altitude work and has completed the beam segment adjacent side to do the safety setting.It ensures the construction quality and safety and stability of the prestressed concrete continuous box girder hanging basket.
作者
唐春刚
徐伟
Tang Chungang;Xu Wei(School of Logistics Management Wuxi Institute of Transportation Jiangsu Union Technical Institute,Wuxi Jiansu 214151,China;The Third Engineering Co.,Ltd.of China Railway 12th Bureau Group,Taiyuan Shanxi 030024,China)
出处
《山西建筑》
2024年第3期142-145,共4页
Shanxi Architecture
基金
2021年江苏高校青蓝工程培养对象项目资助(苏教师函[2020]42号)
江苏联合职业技术学院无锡交通分院校级课题项目“预应力混凝土智能张拉与压浆应用研究”。
关键词
预应力混凝土
连续箱梁
挂篮施工
安全技术
prestressed concrete
continuous box girder
hanging basket construction
security technology