摘要
为探究煤矿立井四角罐道的力学特征,自主设计了一种适用于四角罐道的动力响应监测方法。通过增设加速度传感器与应变片及其动态测试系统,获取煤矿立井提升容器在多工况运行条件下,四角罐道结构所受水平位移时程数据信息。分析监测结果发现,停罐卸煤过程中四角罐道的水平位移随提升终端荷载的增大而增大;箕斗的下盘滑靴作用四角罐道时,引起的水平位移峰值为主井实测发生水平位移的峰值最大值位置;在静止工况下,四角罐道的水平位移峰值大于其在运行工况中的水平位移峰值;提升容器与四角罐道的相互作用力为低频冲击荷载。
In order to explore the mechanical characteristics of the four-corner tank channel,a dynamic response monitoring method suitable for the four-corner tank channel was independently designed.By adding acceleration sensor,strain gauge and its dynamic testing system,the time history data information of horizontal displacement on the four-corner tank channel structure of the mine shaft lifting container under multi-working conditions is obtained.Analysis of the monitoring results found that the horizontal displacement of the four-corner tank channel increases with the increase of the lifting terminal load during the process of stopping the tank and unloading coal;When the sliding shoe of the lower plate of the skip acts on the four-corner tank channel,the peak horizontal displacement is at the position where the actually measured maximum horizontal displacement peak occurs in the main well;In static conditions,the peak horizontal displacement of the four corner tank channel is greater than its peak horizontal displacement in operating conditions;The interaction force between the lifting container and the four corner tank channel is a low-frequency impact load.
作者
黄博华
马香玲
高路
雒江超
葛辉
HUANG Bohua;MA Xiangling;GAO Lu;LUO Jiangchao;GE Hui(China Coal Xi’an Design Engineering Co.,Ltd.,Xi’an 710054,China;School of Civil Engineering,Xi’an University of Architecture and Technology,Xi’an 710054,China)
出处
《陕西煤炭》
2024年第2期60-64,69,共6页
Shaanxi Coal
基金
中煤西安设计工程有限责任公司横向课题“煤矿立井提升容器四角罐道应力应变测试及分析的技术服务”(XMSHT*JS-K-GDSL-00-21-017)。
关键词
煤矿立井
四角罐道
动力响应
应力应变
水平位移
终端荷载
coal mine shaft
four-corner tank channel
dynamic response
stress-strain
horizontal displacement
terminal load