摘要 以基岩凸起为代表的软硬不均地层对盾构施工有很大影响,特别是在市区施工受环境限制无法采用常规手段进行预破碎的情况下,盾构机能不能穿越,如何安全穿越基岩凸起成为困扰工程技术人员的重大难题。以厦门地铁2号线五缘湾南站—五缘湾站区间盾构通过长80m未预破碎的极高强度花岗岩基岩凸起为背景,分析基岩凸起的地质构成及其对盾构施工带来的危害,提出了针对性的解决措施并成功实践。 The heterogeneous soft and hard strata represented by bedrock bumps have a great impact on shield construction.Especially in the case that the urban construction cannot be pre-broken by conventional means due to environmental restrictions,the shield function cannot pass through.How to safely cross bedrock bulges has become amajor problemfor engineers.Based on the 80 m long unbroken high strength granite bedrock bullion of Wuyuanwan South Station and Wuyuanwan Station section of Xiamen Metro Line 2,the geological composition of bedrock bullion and its harmto shield construction are analyzed,and the relevant solutions are put forward and successfully implemented.
作者 张志达 ZHANG Zhi-da(China Railway Tunnel Stock Co.Ltd.,Zhengzhou 450000,China)
出处 《工程建设与设计》 2024年第1期115-117,共3页 Construction & Design for Engineering
关键词 软硬不均地层 基岩凸起 极高强度花岗岩 土压平衡盾构 heterogeneous ground uplift bedrock extremely high strength granite uplift bedrock earth pressure balance shield
  • 相关文献

参考文献2

二级参考文献11

共引文献62

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部