摘要
文章以凹水河水库为案例,根据实际案例现场地形条件,以快速高效、施工安全的原则总结施工经验,对爆破工艺、安全管理等施工关键技术进行总结,以期为峡谷河床拱坝相似工程开挖及相关从业人员提供参考。
This paper takes the Aoshuihe reservoir as a case,according to the actual case site terrain conditions,summarizes the construction experience with the principle of fast,efficient and safe construction,and summarizes the key construction technologies such as blasting technology and safety management,in order to provide references for excavation of similar projects of canyon riverbed arch DAMS and related practitioners.
作者
张所倩
ZHANG Suoqian(Sinohydro Engineering Bureau 8 Co.,Ltd.,Changsha 410000,China)
关键词
凹水河水库
拱坝
高陡
开挖施工
Aoshuihe reservoir
arch dam
high and steep
excavation construction