为适应目前北京市公路建设工程的快速发展,本文针对爆破工程预算定额编制方法进行深入研究,系统阐述北京市现行爆破工程相关预算定额存在的问题、4种编制方法的优缺点等。以国道109新线高速公路小龙门隧道工程为依托,利用写实记录法对小龙门隧道爆破预算定额进行测定与分析,为北京市公路工程爆破施工专项预算定额的编制提供了科学依据和参考。
In order to adapt the current rapid development of highway construction projects in Beijing,this paper conducts an in-depth study on the preparation method of budgetary quotas for blasting projects,systematic elaboration of the problems of the existing blasting engineering budget quotas in Beijing,and the advantages and disadvantages of the four preparation methods,etc.Based on the Xiao Longmen Tunnel Project of the National Highway 109 New Line Expressway,the budget quotas of Xiao Longmen Tunnel Project was measured and analyzed by using the realistic record method,which provided a scientific basis and reference for the preparation of the special budget quotas of blasting construction of highway construction in Beijing.
作者
刘丹卉
李攀云
张小军
LIU Danhui;LI Panyun;ZHANG Xiaojun(Beijing Transportation Infrastructure Construction Project Management Center,Beijing 100161;Faculty of Architecture,Civil and Transportation Engineering,Beijing University of Technology,Beijing 100124)
出处
《中国科技纵横》
2023年第24期102-104,107,共4页
China Science & Technology Overview
关键词
爆破工程
预算定额编制
写实记录法
小龙门隧道
blasting engineering
budget quotas preparation
realistic record method
Xiao Longmen tunnel