期刊文献+

浅谈汽车覆盖件模具项目管理中的计划控制

Discussion on the Planning Control in the ProjectManagement of Automobile Covering Parts Die
下载PDF
导出
摘要 在汽车开发周期不断缩短的背景下,模具开发周期同样迎来挑战,面对挑战,模具企业需要精准安排计划、充分配置资源,项目管理应用网络图计划管理模式是一个有效的办法。介绍了当前汽车模具的开发流程,针对项目管控下模具交付周期容易延误的现状,分析了新车型研制下模具开发项目管理节点,采用了基于计划网络模式的开发流程图,重点对模具制造环节的计划编制控制进行了分析,能够有效地监测项目实施过程中节点完成信息,并能够及时进行动态调整,有效地保证了模具开发与交付周期。 In the context of the continuous shortening of the automotive development cycle,the die development cycle is also facing challenges,in the face of challenges,die enterprises need to accurately arrange plans and fully allocate resources,project management application network diagram plan management mode is an effective way.This paper introduces the current development process of automobile die.Aiming at the current situation that die delivery cycle is easy to be delayed under project control,it analyzes the project management nodes of die development under the development of new models,adopts the development flow chart based on the plan network mode,and focuses on the analysis of the planning and control of die manufacturing links,which can effectively monitor the completion information of nodes during the project implementation.And can be timely dynamic adjustment,effectively ensure the die development and delivery cycle.
作者 闫庆禹 罗莉 陈科 段彦宾 Yan Qingyu;Luo Li;Chen Ke;Duan Yanbin(Sichuan Yibin Pushi Group Co.,Ltd.,Yibin,Sichuan 644000,CHN;Chengdu Push Automobile Mold Co.,Ltd.,Chengdu,Sichuan 610031,CHN)
出处 《模具制造》 2024年第1期1-4,7,共5页 Die & Mould Manufacture
关键词 汽车模具 项目管理 计划网络 计划控制 Automobile die project management planning network planning control
  • 相关文献

参考文献4

二级参考文献16

  • 1田福祥.现代模具技术的特点及其发展趋势[J].热加工工艺,2004,33(8):55-57. 被引量:6
  • 2郭蕊.国内外项目管理研究的理论、框架及其进展[J].现代管理科学,2006(5):27-29. 被引量:17
  • 3曹延安.中国模具工业的现状与发展趋向[J].机械工程师,2006(5):5-6. 被引量:5
  • 4WIGHT O W. Input/output control: a real handle on lead times[J]. Production and Inventory Management, 1970, 11(3) :9-30.
  • 5KINGSMAN B G. Modelling input-output workload control for dynamic capacity planning in production planning systems [J]. International Journal of Production Economics, 2000, 68(1) :73-93.
  • 6STEVENSON M, HENDRY L C. Aggregate load-oriented workload control: a review and a re-classification of a key approach[J]. International Journal of Production Economics, 2006,104(30/31) :676-693.
  • 7BERGAMASCHI D, CIGOLINI R, PERONA M, et al. Order review and release strategies in a Job Shop environment:a review and a classification[J]. International Journal of Production Economics, 1997,35(2) : 399-420.
  • 8GAALMAN G, PERONA M. Workload control in job shops: an introduction to the special issue[J]. Production Planning & Control, 2002,13(7): 565-567.
  • 9SILVA C, ROQUE L, ALMEIDA A. MAPP--a Web-based decision support system for the mould industry[J]. Decision Support Systems, 2006,42 (2) : 999-1014.
  • 10HENRICH P, LAND M, GAALMAN G. Grouping machines for effective workload control[J]. International Journal of Production Economies,2006,104(1) : 125-142.

共引文献22

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部