基于WSS注浆加固技术的花岗岩山岭隧道塌方处治方案

A Collapse Treatment Plan for Granite Mountain Tunnels Based on WSS Grouting Reinforcement Technology
下载PDF
导出
摘要 隧道工程施工时,可能会受到爆破作业扰动、特殊水文地质条件等因素的影响而出现诸如冒顶、塌方、透水等突发事件,不仅影响施工活动的进行,还会对作业人员的生命安全造成危害[1]。花岗岩地区的山岭隧道富水地层出现塌方时,可采取WSS超前注浆加固、超前支护等措施,对塌方隧道掌子面上方及前方围岩产生固结作用,提高围岩自稳能力,可起到良好的处治效果。 During tunnel construction,unexpected events such as roof caving,collapse,and seepage may occur due to factors such as blasting disturbance and special hydrogeological conditions.This not only affects the progress of construction activities,but also poses a threat to the safety of workers.When collapse occurs in the rich water strata of mountain tunnels in granite areas,measures such as WSS advanced grouting reinforcement and advanced support can be taken to solidify the surrounding rock above and in front of the collapsed tunnel face,improve the self stabilization ability of the surrounding rock,and achieve good treatment effects.
作者 王扬 WANG Yang(The First Engineering Company of CCCC Fourth Harbor Engineering Co.,Ltd.,Guangzhou 510000,China)
出处 《价值工程》 2024年第3期53-55,共3页 Value Engineering
关键词 隧道塌方 WSS注浆加固 花岗岩山岭隧道 tunnel collapse WSS grouting reinforcement granite mountain tunnel
  • 相关文献

参考文献4

二级参考文献34

共引文献19

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部