基于改进型AHP法的抽水蓄能电站项目后评价研究

Research on Post Evaluation of Pumped Storage Power Station Projects Based on Improved AHP Method
下载PDF
导出
摘要 对抽水蓄能电站项目后评价工作内容进行深入研究,构造抽水蓄能电站项目后评价体系,采用改进型层次分析法对指标体系进行权重分配,最终得到抽水蓄能电站项目后评价指标体系各级指标权重及分值表,可用于抽水蓄能电站项目后评价量化分析。 This article conducts in-depth research on the post evaluation work of pumped storage power station projects,constructs a post evaluation system for pumped storage power station projects,uses an improved Analytic Hierarchy Process to allocate weights to the indicator system,andfinally obtains the weights and score tables of each level of the post evaluation indicator system for pumped storage power station projects,which can be used for quantitative analysis of post evaluation of pumped storage power station projects.
作者 刘芳欣 张扬 翟海燕 LIU Fangxin;ZHANG Yang;ZHAI Haiyan(Pumped-storage Technological&Economic Research Institute,State Grid Xinyuan Company Ltd,Beijing 100053,China;China Power Beijing Engineering Co.,Ltd,Beijing 100024,China)
出处 《建筑经济》 北大核心 2023年第S02期162-165,共4页 Construction Economy
基金 国网新源公司科技项目“技术经济院抽水蓄能电站项目后评价指标参数研究与应用”(SGXYKJ-2022-048)。
关键词 抽水蓄能电站 项目后评价 改进型AHP法 pumped storage power station land acquisition and resettlement improved AHP method