期刊文献+

西藏DG水电站大坝安全监测系统设计

Design of the Dam Safety Monitoring System for Xizang DG Hydropower Station
下载PDF
导出
摘要 基于相关规程规范和已建工程经验,结合西藏DG水电站坝址区水文地质条件、枢纽工程的布置及各建筑物结构形式,各项安全监测设施的特点,研究建立了大坝自动化安全监测系统。电站下闸蓄水至今,大坝安全监测系统运行正常,变形、位移、渗流等实测资料、现场巡查及相关复核计算成果表明,大坝工作性态正常,满足设计和相应规程规范等要求,自动化安全监测系统可供类似工程设计参考。 Following the relevant regulations and specifications and the experience of existing projects,and also considering the hydrogeological conditions of the dam site area,the layout of the project,the forms of various structures,and the characteristics of various safety monitoring facilities,an automatic dam safety monitoring system is established in Xizang DG Hydropower Station.Since the impoundment of the station,the dam safety monitoring system has been operating normally.The measured data on dam deformation,displacement and seepage,on-site inspection and relevant calculation results show that the working behavior of the dam is normal and fulfills the requirements of the design and corresponding regulations.The design of the dam safety monitoring system can be useful reference for similar projects.
作者 季昀 刘贝贝 王玉洁 吴世勇 朱瑞晨 郑晓红 JI Yun;LIU Beibei;WANG Yujie;WU Shiyong;ZHU Ruichen;ZHENG Xiaohong(Powerchina Huadong Engineering Corporation,Hangzhou 310000,China;Large Dam Safety Supervision Center,National Energy Administration,Hangzhou 310000,China)
出处 《水电与新能源》 2024年第1期40-43,共4页 Hydropower and New Energy
基金 国家重点研发计划项目课题(2021YFC3090102)经费项目。
关键词 碾压混凝土重力坝 水电站设计 安全监测 工作性态 roller compacted concrete dam hydropower station design safety monitoring working behavior
  • 相关文献

参考文献7

二级参考文献25

共引文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部