期刊文献+

矿山盲电梯井施工方法创新分析

Analysis on the innovation of blind elevator shaft construction method
下载PDF
导出
摘要 盲电梯井(JP/TM)是一种高精度且施工难度较大的电梯井道,其最大的优势就在于能够在矿坑的所有地层及地表地形环境下开展精密的施工作业,为后续矿井工作给予良好的施工条件。由于矿井地下施工往往会存在安全风险,且地质情况复杂,矿井测量工作涉及许多复杂的地质因素。所以,在井下作业时,必须采取一定的安全措施才能进行测量作业,以保证测量作业的安全性,为此,文章将通过对该方法的安全风险及创新点开展深入分析,希望能为工程建设单位和施工单位提供一定的参考。 Blind elevator shaft(JP/TM)is a kind of elevator shaft with high precision and great construction difficulty.Its biggest advantage is that it can carry out precise construction in all strata and surface terrain of the pit,providing good construction conditions for subsequent mine work.Because the underground construction of the mine often has safety risks and the geological conditions are complex,the mine survey involves many complex geological factors.Therefore,during the downhole operation,certain safety measures must be taken to ensure the safety of the measurement operation.For this reason,the article will carry out in-depth analysis on the safety risks and innovations of this method,hoping to provide some reference for the project construction unit and the construction unit.
作者 刘劼 LIU Jie(Kangjiawan Mine of Hunan Shuikoushan Nonferrous Metals Group Co.,Ltd.,Hengyang 421500,China)
出处 《世界有色金属》 2023年第17期40-42,共3页 World Nonferrous Metals
关键词 矿山 盲电梯井 施工方法 创新分析 mine Blind elevator shaft Construction method Innovation analysis
  • 相关文献

参考文献2

二级参考文献8

共引文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部