为提升我国高速铁路地震预警监测系统联调联试试验组织水平、强化试验安全可控程度、提高系统联调联试工作效率,结合新建南宁—崇左高速铁路地震预警监测系统联调联试项目,从前提条件及风险管控,新建线和既有线开展系统联调联试区分,列控、牵变及车载控车范围的非重合确定等方面,对高速铁路地震预警监测系统联调联试进行优化研究,指出我国高速铁路地震预警监测系统联调联试中存在的问题,并提出建议,以达到提高试验组织工作效率、巩固试验安全保障的目的。
In order to improve the organization of integrated commissioning&test of the earthquake early-warning and monitoring system of high speed railways in China,strengthen the safety controllability of tests,and improve the efficiency of integrated commissioning&test of the system,relying on the integrated commissioning&test project for the earthquake earlywarning and monitoring system of the new Nanning-Chongzuo HSR,this paper optimizes the integrated commissioning&test of the earthquake early-warning and monitoring system of high speed railways from the aspects of preconditions and risk control,distinguishing between integrated commissioning&test for new lines and existing lines,and determining the nonoverlapping scope of train control,traction substation,and onboard vehicle control.It also puts forward the problems existing in the integrated commissioning&test of the earthquake early-warning and monitoring system of high speed railways in China and presents suggestions to improve the efficiency of test organization and strengthen the test safety assurance.
作者
王凯金
张杰
黄佳佳
李迪识
WANG Kaijin;ZHANG Jie;HUANG Jiajia;LI Dishi(Railway Science&Technology Research&Development Center,China Academy of Railway Sciences Corporation Limited,Beijing 100081,China;China Railway Nanning Group Co.,Ltd.,Nanning Guangxi 530000,China)
出处
《铁路技术创新》
2023年第6期55-61,共7页
Railway Technical Innovation
基金
中国国家铁路集团有限公司科技研究开发计划项目(J2021G015)。
关键词
高速铁路
地震预警监测系统
联调联试
试验组织
风险管控
铁路安全
high speed railway
earthquake early-warning and monitoring system
integrated commissioning&test
test organization
risk control
railway safety