期刊文献+

公共建筑的变压器负荷计算

Load Calculation of Public Buildings
下载PDF
导出
摘要 随着经济快速发展,近些年大型民用公共建筑开发迅速,如写字楼、商业MALL、星级酒店等建筑快速竣工,但许多项目在投入运营后,物业反馈变压器普遍运行在较低负载率工况,一般为30%~50%,经济性明显不佳。由于形成此问题的原因存在多种可能,因此拟从前期设计阶段的负荷计算过程入手,分析说明问题的成因,并以实际案例进行对比说明,以期对类似项目有所借鉴,为最终决策提供技术支持。 With the rapid development of economy,huge civil public buildings have been constructed rapidly recent years,such as office buildings,commercial malls,luxury hotels.However,many personnel in charge of property management confirm that there exist commonly in public buildings in service relatively low load rates of transformers(generally 30%~50%),resulting in poor ecologic efficiency.Lots of factors can be attributed to this situation.The present work made an attempt to determine the causes by exploring the process of load calculation in the period of constructional drawing design.The paper also comparatively describes some actual cases,in order to provide useful information and support for similar projects.
作者 刘渊翔 蒋徵 LIU Yuanxiang;JIANG Zheng(China Green Development Investment Group Co.,Ltd.,Beijing 100020,China;Beijing Boyi Jiye Engineering Consulting Co.,Ltd.,Beijing 100027,China)
出处 《电工技术》 2024年第1期128-132,共5页 Electric Engineering
关键词 变压器 负荷计算 设备分类 需要系数 功率因数 transformer load calculation equipment classification demand coefficient power factor
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部