摘要
为解决实践生产能耗大以及由于装机功率限制其生产能力增大的问题,通过数值模拟计算手段对中部切槽诱导掘进工艺和正常掘进工艺进行对比,得出采用中部切槽诱导掘进工艺对深部岩层巷道进行掘进,可达到降低掘进力和低能耗掘进的效果[1];并重点对其端头进刀工艺和正常掘进工艺进行说明;最后,对智能化诱导掘进工艺的降能耗效果进行仿真评估[2-3]。
In order to solve the problems of high energy consumption in practical production and increased production capacity due to limited installed power,a comparison was made between the central groove induction excavation process and the normal excavation process through numerical simulation calculation.It was found that using the central groove induction excavation process for deep rock roadway excavation can achieve the effect of reducing excavation force and low energy consumption excavation.This paper emphasizes the explanation of end cutting process and normal excavation process.Finally,it simulates and evaluates the energy consumption reduction effect of intelligent induction tunneling technology.
作者
王位
Wang Wei(Shouyang Kaiyuan Mining Co.,Ltd.,Yangquan Coal Industry(Group)Co.,Ltd.,Shouyang Shanxi 045400,China)
出处
《山西化工》
CAS
2024年第1期221-222,共2页
Shanxi Chemical Industry
关键词
智能化诱导
深部岩层巷道
中部切槽诱导掘进
掘进比能耗
intelligent induction
deep rock roadway
middle groove induction excavation
energy consumption of excavation ratio