摘要
在干熄焦工程提升机的设计中,会涉及到提升机走行距离、电缆拖链长度和电缆拖链导向槽长度等计算。因此,文章针对干熄焦工程提升机电缆拖链长度的相关计算进行了总结,详细介绍了其计算方法,并探讨了设计过程所获得的经验,以期对同类电缆拖链长度的计算提供参考。
In the design of the crane in CDQ project,it will involve the calculation of the running length of the crane,the length of the cable towing chain and the length of the guide groove of the cable towing chain.Therefore,this paper summarizes the relevant calculation of cable towing chain length of the crane in CDQ project,introduces its calculation method in detail,and discusses the experience gained in the design process,in order to provide reference for the calculation of similar cable towing chain length.
作者
张帅
ZHANG Shuai(Jigang Group International Engineering Technology Co.,Ltd.,Ji’nan 250000,China)
出处
《化工管理》
2024年第3期120-122,共3页
Chemical Engineering Management