摘要
碾压混凝土大坝上游防渗设计和施工是这类坝型需要重视的关键环节,而碾压混凝土层面结合质量直接影响坝体的抗渗性,往往是碾压混凝土大坝防渗的薄弱环节。从碾压混凝土上游防渗设计、表面辅助防渗方案选择、原材料性能和施工要点等方面开展研究,最后选定双峰寺水库大坝上游防渗设计方案,明确施工要点,保证工程顺利实施。
The design and construction of upstream impervious layer of roller compacted concrete(RCC)dam is the key link of this kind of dam.The combination quality of roller compacted concrete(RCC)layer directly affects the impermeability of dam,which is the weak link of RCC dam.In this paper,the design of impervious layer of roller compacted concrete upstream,the choice of surface-aided impervious scheme,the performance of raw materials and construction points are studied.Finally,the design scheme of upstream impermeable layer of Shuangfengsi Reservoir dam is selected,the key points of construction are defined,and the smooth implementation of the project is ensured.
作者
康军红
KANG Junhong(Hebei Institute of Investigation&Deign of Water Conservancy&Hydropower Group Limited,Tianjin 300220,China)
出处
《水科学与工程技术》
2024年第1期34-36,共3页
Water Sciences and Engineering Technology
基金
河北省水利厅科研立项课题《寒冷地区全断面碾压混凝土大坝配合比及温控防裂研究》(RD2015-13)。
关键词
碾压混凝土重力坝
大坝防渗
水库
roller compacted concrete gravity dam
large dam seepage control
reservoir