三乡围下滘泵站重建工程设计要点

Design Points for Reconstruction of Sangxiang Weixiajiao Pump Station
原文传递
导出
摘要 此研究主要以三乡围下滘泵站重建工程项目为例,首先简要概括该工程的基本情况,进行设计初期的计算及数据统计,明确工程建设环境及水文特征,提出设计方案及方案的创新,并围绕设计要点展开分析,从施工布置、基坑支护计算及排涝等方面进行具体分析。最后根据计算所得数据进行水泵选型,并提出对进出水管进行优化设计,总结项目施工要点。 This study mainly takes the reconstruction project of Sangxiang Weixiajiao Pump Station as an example.Firstly,it briefly summarizes the basic situation of the project,carries out calculation and data statistics at the initial stage of design,defines the construction environment and hydrological characteristics of the project,puts forward the design scheme and the innovation of the scheme,and analyzes around the key points of design.The concrete analysis is made from the aspects of construction layout,foundation pit support calculation and waterlogging design.Finally,according to the calculated data,the selection of water pump is carried out,and the optimization design of the inlet and outlet water pipe is proposed,and the key points of project construction are summarized.
作者 黄炳昌 HUANG Bingchang(Water Affairs Center,Huangpu Town,Zhongshan City,Guangdong Province,Zhongshan 528429,China)
出处 《河南水利与南水北调》 2023年第11期61-62,共2页 Henan Water Resources & South-to-North Water Diversion
关键词 泵站更新 改造设计 优化 规范要求 pump station renewal reconstruction design optimization specification requirement
  • 相关文献

参考文献3

二级参考文献16

共引文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部