摘要
坪山生物医药产业加速器园区项目12号楼超高层裙房部位存在悬挂式钢结构体系,介绍了悬挂式钢结构的主要施工流程、施工技术、施工模拟、临时支撑及卸荷技术,通过MIDAS软件对施工过程进行模拟分析。
There is a suspended steel structure system in the super high-rise podium of building No.12 of Pingshan biomedical industry accelerator park project.The main construction process,construction technology,construction simulation,temporary support and unloading technology of the suspended steel structure are introduced,and the construction process is simulated and analyzed through midas.
作者
朱朝聪
沈洋
陈伟
王雪
Zhu Chao-cong;Shen Yang;Chen Wei;Wang Xue
出处
《建筑技术开发》
2024年第1期49-51,共3页
Building Technology Development
关键词
悬挂式钢结构
施工流程
施工模拟
施工模拟计算
suspended steel structure
construction process
construction simulation
construction simulation calculation