长输管道工程在进行建设时,因为施工地形条件较为复杂,特别是在设计和实际建设阶段,有可能面临极为复杂的工作和管理问题。为了切实提高此类工程的建设效率,妥善处理复杂工作问题,就要求在开工之前,对工程总成本加以合理估算,从而方便施工单位能够对长输管道工程的投资过程做到精准、有效的控制,实现对投入资金的最大化节约,防止发生资金浪费。为此,本文基于长输管道工程建设项目概算中的常见问题,探讨了实际的概算策略和资金核对方式。
During the construction of long-distance pipeline project,because the construction terrain conditions are more complicated,especially in the design and actual construction stage,it may face extremely complicated work and management problems.In order to effectively improve the construction efficiency of such projects and properly deal with complex work problems,it is required to reasonably estimate the total cost of the project before starting,so as to facilitate the construction unit to achieve accurate and effective control of the investment process of the long-distance pipeline project,achieve the maximum savings of the investment funds,and prevent the waste of funds.Therefore,based on the common problems in the budget estimate of long-distance pipeline engineering construction projects,this paper discusses the actual budget estimate strategy and fund verification method.
作者
张文镜
Zhang Wen-jing(China Petroleum Pipeline Second Engineering Co.,Ltd.,Xuzhou 221000,Jiangsu Province,China)
出处
《建筑与装饰》
2024年第4期157-159,共3页
Construction & Decoration
关键词
长输管道工程
建设项目
概算
问题
对策
long-distance pipeline engineering
construction project
budget estimate
problem
countermeasure