期刊文献+

核电站倾斜通道施工技术研究

Research on Construction Technology of Inclined Channel in Nuclear Power Plant
下载PDF
导出
摘要 核电站的建设过程中,示范快堆核燃料运输通道为倾斜式50°角通道,位于乏燃料厂房。倾斜运输机通道作为核电重要设备倾斜运输机的通道,安装精度要求很高,选择合适的施工方法,可以有效提高倾斜通道的施工质量及进度。基于此,简单介绍了倾斜通道安装的新施工技术,希望对后续倾斜通道安装有相应的帮助。 During the construction process of nuclear power plants,the demonstration fast reactor nuclear fuel transportation channel is an inclined 50°angle,located in the spent fuel plant.The inclined conveyor channel,as an important channel for nuclear power equipment,requires high installation accuracy.Choosing appropriate construction methods can effectively improve the construction quality and progress of the inclined channel.This article briefly describes the new construction technology for the installation of the inclined channel,I hope it will be helpful for the subsequent installation of inclined channels.
作者 常翔涛 CHANG Xiangtao(China Nuclear Industry Huaxing Construction Co.,Ltd.,Nanjing 210019,China)
出处 《电工技术》 2023年第S01期232-233,236,共3页 Electric Engineering
关键词 核电 倾斜通道 安装 nuclear power inclined channel installation
  • 相关文献

参考文献3

二级参考文献18

共引文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部