期刊文献+

水电站二次工作绑扎带使用问题及解决办法研究

Research on the Problems and Solutions of the Use of Secondary Work Binding Tapes in Hydropower Stations
下载PDF
导出
摘要 水电站开展二次工作时,经常用得到绑扎带。但是,绑扎带在使用的过程中,会逐渐出现绑扎带预留长度不一、绑扎带切口锋利,进行柜内卫生清扫容易伤到手、两根或者多根绑扎带绑扎同一部位时出现的绑扎凌乱,绑扎带结头朝向各异,影响柜内整齐美观等问题。针对水电站使用绑扎带进行二次工作时出现的这些问题进行研究和分析,提出解决办法。 When carrying out secondary work in hydropower stations,binding tapes are often used.However,during the use of binding tapes,there may be problems such as uneven reserved length of binding tapes,sharp cutting edges of binding tapes,easy injury to hands during cabinet cleaning,disorderly binding when two or more binding tapes are tied to the same part,different orientations of binding tapes,and affecting the neat and beautiful appearance of the cabinet.This paper conducts research and analysis on the problems that arise during the secondary work of hydropower stations using binding tapes,and proposes solutions.
作者 余继乾 刘照友 YU Jiqian;LIU Zhaoyou(Yunnan Huadian Jinsha River Midstream Hydropower Development Co.,Ltd.,Liyuan Power Generation Branch,Lijiang 674100,China)
出处 《云南水力发电》 2024年第2期156-158,共3页 Yunnan Water Power
关键词 水电站 二次工作 绑扎带 使用问题 研究分析 hydropower station secondary work binding tape usage issues research analysis
  • 相关文献

参考文献4

二级参考文献9

共引文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部