滇中引水工程变更单价管理实践及思考

Management Practice and Reflection on Changing Unit Price of Dianzhong Water Diversion Engineering
下载PDF
导出
摘要 建设项目实施过程中,工程变更难以避免,合理确定变更项目单价是工程建设管理的一项基础工作。文章从变更单价报审流程、审核方法、重要管控措施等方面对滇中引水工程变更单价管理工作进行梳理总结,对新增材料单价确定、新增混凝土配合比确定、工程量清单漏项、审减不审增等问题展开讨论和研究,有助于强化对变更单价审核工作的理解和认识。 During the implementation of construction projects,engineering changes are difficult to avoid.Reasonably determining the unit price of change projects is a fundamental task in engineering construction management.The paper summarizes the management of unit price changes in the Dianzhong Water Diversion Project from the aspects of the approval process,review methods,and important control measures.It also discusses and studies issues such as determining the unit price of newly added materials,determining the mix proportion of newly added concrete,missing items in the bill of quantities,and reviewing whether to reduce or not to increase,which helps to strengthen the understanding and understanding of the review work for changing unit prices.
作者 李俊伟 LI Junwei(Yunnan Dianzhong Water Diversion Engineering Co.,LTD,Kunming 650051,China)
出处 《云南水力发电》 2024年第2期169-172,共4页 Yunnan Water Power
关键词 滇中引水工程 变更单价 管理措施 Dianzhong Water Diversion Engineering changing unit price management measure
  • 相关文献

参考文献3

二级参考文献8

共引文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部