期刊文献+

偏压小净距隧道初期支护施工力学研究 被引量:2

Mechanical Study on Initial Support Construction of Bias Neighborhood Tunnels
下载PDF
导出
摘要 为研究不同施工顺序下偏压小净距隧道初期支护及周边围岩的稳定性,采用有限元法进行数值模拟,结合初期支护内力、围岩变形和塑性区范围的计算结果进行比较分析,得到隧道周边围岩的变形原因及规律,提出以隧道间土体受力状态为主要依据进而确定施工顺序的结论,为类似隧道工程提供参考依据。 In order to study the stability of initial support and surrounding rock of the bias neighborhood tun-nels under different construction sequences,finite element method was used for numerical simulation.Combined with the calculation results of initial support stress,surrounding rock deformation and plastic zone range,the cause and law of the surrounding rock deformation were obtained.It was shown that the construction sequence should be determined based on the stress state of the surrounding rock between tunnels,which provide a refer-ence basis for similar tunnel projects.
作者 赵德源 邢增波 杨瀚鹏 王峥 徐杰 Zhao Deyuan;Xing Zengbo;Yang Hanpeng;Wang Zheng;Xu Jie(Beijing First Development Road and Bridge Engineering Co.,Ltd.,100000,China;Beijing Zhengping Construction Group Co.,Ltd.,101100,China;Gonglian Jieda Highway Maintenance Engineering Co.,Ltd.,Beijing 100071,China;Changping District Commission of Housing and Urban Rural Development of Beijing Municipality,102200,China;Beijing Fangshan District City Construction Group Co.,Ltd.,102400,China)
出处 《特种结构》 2024年第1期110-113,120,共5页 Special Structures
关键词 偏压小净距隧道 初期支护 施工顺序 Bias neighborhood tunnels Initial support Construction sequence
  • 相关文献

参考文献1

二级参考文献9

共引文献12

同被引文献8

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部