成宜高铁天府牵引变配电所BIM辅助设计

BIM Auxiliary Design of Tianfu Traction Transformer and Distribution Station of Chengyi High-Speed Railway
下载PDF
导出
摘要 成宜高铁天府站枢纽牵引变配电所是220 k V牵引变电所和110/10 kV变配电所合建所。所内高低压电缆众多,为合理布置电缆,方便电缆运维,采用BIM技术对所内高压电缆的布置进行辅助设计,优化电缆敷设路径。 The traction transformer and distribution station of Tianfu Station of Chengyi High-speed Railway is a joint construction institute of 220 kV traction substation and 110/10 kV transformer and distribution substation.There are many high and low voltage cables in the station.In order to reasonably arrange cables and facilitate cable operation and maintenance,BIM technology is adopted to auxiliary design the layout of high voltage cables in the station and optimize the cable laying path.
作者 施敏 邱俊清 许晓蓉 SHI Min;QIU Junqing;XU Xiaorong(China Railway Second Hospital Engineering Group Co.,Ltd.,Chengdu,Sichuan 610036,China)
出处 《自动化应用》 2024年第2期129-131,共3页 Automation Application
关键词 成宜高铁 牵引变电 天府 BIM技术 REVIT Chengyi high-speed railway traction substation Tianfu BIM technology Revit

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部