基于定额回归法的导流洞工程赶工费用计算

Acceleration Cost Calculation for Diversion Tunnels Based on Quota Regression Analysis
下载PDF
导出
摘要 导流隧洞施工受水文、地质、施工环境等不确定性因素影响,常出现工期延误需进行赶工。针对水电站导流洞施工过程中的单一工期延误事件,分析了常见的变更方案及对应的理论延误工期确定方法,提出一种基于定额回归法的导流洞工程赶工费用计算方法,并将该方法应用于白鹤滩水电站导流洞施工中。结果表明,该方法能确定各延误事件与工序影响的对应关系,判别非承包商责任的工期延误和赶工事实,并计算出完整的赶回工期、赶工工序及赶工费用,为工程索赔提供了参考依据。 The construction of diversion tunnels is affected by uncertain factors such as hydrology,geology,and environment,so contractors are always required acceleration caused by projects delay.Aiming at the single project delay event of the diversion tunnel of hydropower station,the engineering change plans and their theoretical delay period were discussed.A method that calculates acceleration costs based on the quota regression analysis was proposed.A diversion tunnel case of Baihetan Hydropower Station show that this method can determine the relationships between each delayed event and the influence of processes,and identify the fact that the contractor is not responsible for the delay and acceleration as well as calculate complete acceleration time,processes and costs,which provide a basis for engineering claims.
作者 刘乐 刘潋 黄建文 刘敏 张光飞 LIU Le;LIU Lian;HUANG Jian-wen;LIU Min;ZHANG Guang-fei(College of Hydraulic and Environmental Engineering,China Three Gorges University,Yichang 443002,China;State Key Laboratory of Hydropower Project Construction and Management of Hubei Province,China Three Gorges University,Yichang 443002,China;Guodian Dadu River Drainage Area Hydroelectricity Development Corporation Limited,Chengdu 610000,China;China Jianghe Real Estate Development Company,Beijing 101100,China)
出处 《水电能源科学》 北大核心 2024年第1期84-87,共4页 Water Resources and Power
基金 国家自然科学基金项目(51879147) 水电工程施工与管理湖北省重点实验室开放基金(2020KSD12)。
关键词 导流洞 赶工费 定额回归法 索赔 水电站施工 diversion tunnels acceleration cost quota regression analysis claim hydropower station construction