摘要
山地风电场外的干线道路运输一直是困扰项目开发的重要因素。通过对湘西土家族苗族自治州古丈县的地形地貌合理分析,利用沅江支流酉水途径古丈县的地形优势,提出了风机设备“水陆联运”的新方案,为山地风电场大件运输提供新的方向,可供类似工程参考。
The main road transportation outside mountainous wind farms is usually an important factor affecting the project development.With the analysis of the terrain and landforms of Guzhang County in Xiangxi Tujia and Miao Autonomous Prefecture,an innovative water-land joint transportation scheme for wind turbine components is proposed,in which the topographic advantage that the Youshui River,a branch of the Yuanjiang River,passes through the County is used.It provides a new direction for the transportation of oversize components in mountainous wind farms,and could be useful reference for similar projects.
作者
朱赛
向悦慈
金彪
陈瑞
唐栋
唐飚
徐帆
曹钢
ZHU Sai;XIANG Yueci;JIN Biao;CHEN Rui;TANG Dong;TANG Biao;XU Fan;CAO Gang(Hunan Branch of China Three Gorges Corporation,Changsha 410000,China;People’s Government of Guzhang County,Xiangxi Tujia and Miao Autonomous Prefecture 416300,China;Changsha Planning&Design Institute Co.,Ltd.,Changsha 410000,China;Development and Reform Commission of Xiangxi Tujia and Miao Autonomous Prefecture,Xiangxi Tujia and Miao Autonomous Prefecture 416300,China;China Energy Engineering Group Hunan Electric Power Design Institute Co.,Ltd.,Changsha 410000,China)
出处
《水电与新能源》
2024年第2期58-61,共4页
Hydropower and New Energy
关键词
山地风电
大件运输
道路
酉水
水陆联运
mountainous wind power
oversize component transportation
road
Youshui River
water-land transportation